Cold Store, with their temperature and air quality control needs, require meticulous design to uphold stable internal environments crucial for product preservation. Selecting construction materials is intricate, necessitating compliance with rigorous standards across various regulations and requirements.
Armthorpe, Doncaster In all activities, HIL draws on its well-established in-house project management skills-base. From the start of every project, HIL pays close attention to the detailing of building works. 1400m2 – 125mm Thick Wall Panels 60 Minute Fire Rating Installed


